Once again, the RCPB is committed to energy efficiency and contracts Savia engineering to carry out various Installations and modifications aimed at this end.
Savia has dismantled the Installations Existing, Boilers Have Been Changed Electric and from propane to gas fuel.
A new gas regulation and measurement facility has also been developed, as well as the installation of a management system for the control of the production of DHW, heating and pumping. The total installed power was 750 Kw.
www.gruposavia.eu