Installations in El Triangle

Instalaciones
1/4/2021
Installations in El Triangle

CBRE has awarded Grupo Savia the works to replace a heat pump with heat recovery located in the El Triangle building with a new Daikin heat pump.

The installation work has already started and all the Installations existing to the new heat pump.

All these works are being carried out entirely by Sava's own staff.

These tasks are being carried out in accordance with the schedule set jointly by CBRE and El Triangle and are being a great success.

From the Savia Group we want to thank both CBRE and El Triangle for having trusted us and congratulate all those Savians who are participating in this complex project.

www.gruposavia.eu